Space and utilities
Complete removal of existing electrical/mechanical services including lighting, heating and air
conditioning systems.
Installation of new power system.
Installation of new concealed systems within the ceiling void. Energy efficient systems for lighting
(including emergency lighting) were installed and all fixtures, fittings and cabling updated.
New, modern fire alarm systems installed including smoke detection and sounders.
Double glazed windows were installed in keeping with the original styling of the building and to maximise
floor space even further the window winding systems were tapered down to floor level.
Decoration
Complete office and utility redecoration including new flooring coverings.
The offices now have a cleaner, more contemporary feel and lend themselves well to full floor use or possible
partitioning if required.